On April 29, 2021, Steelimpex put into operation the new plant for the production of steel electric-welded pipes with a covered area of 7,000 sq.m. and 2,500 square meters of adjacent parking areas. The building is built of high-strength steel structure and thermal panels, equipped with seven new bridge cranes with a capacity of 5 to 25 tons.
The plant has installed and operates high-performance and automated equipment:
• New line for longitudinal cutting of steel coils;
• Three Italian lines for the production of precision pipes and profiles.